Room package · RF-1

Food and Water Storage

A pantry for the long haul: welded shelving rated about 500 lb a shelf, can-rotation and bucket racks, and contained floor zones for water.

Food and water
Food and Water Storage in one cube, roof off.
Room package, per cube$5,900Built into a CUBE or CUBE HD; the interior finish ($12,000) is priced with the cube
  • Months of food in one cube. welded shelving that holds the weight of a real food supply
  • Rotates itself. gravity can racks serve the oldest cans first
  • Water contained. barrels sit in a coated containment pan, so a leak stays put
Shelving3 walls, 5 tiers, about 500 lb per shelf
RacksCan rotation and 5-gallon buckets
WaterContained floor zone for barrels or tanks
MonitorTemperature and humidity alarm
Added weightAbout 840 lb, shipped inside the cube

Floor plan

Laid out to fit
a 9 ft room.

END CAP (future cube)PORTAL 42 in to next cube (mate collar)Shelving, 5 tiersShelvingShelvingWater barrels

About 8 ft 10 in square inside the finished walls. Entry from the next cube at the bottom; the yellow bar is the second portal, capped for a future cube.

What is included

  • Heavy shelving: Welded shelving on three walls, 5 tiers, about 500 lb per shelf, with lips
  • Can-rotation racks: First-in, first-out gravity can racks
  • Bucket racks: Racks for 5-gallon food buckets
  • Inventory board and bins: Inventory board, labeled bins
  • Water containment zone: Coated steel containment pan for water barrels or tanks
  • Climate monitor: Thermometer and humidity monitor with an alarm

How it is built

Built in our shop, inside the cube: welded frames, walls, wiring, lighting and cabinets, then every circuit is tested. On site, your installer plugs the power and air together at the cube joint and checks every circuit.

Upgrades

Furnished add-on 4 x 55 gal water barrels, pump and filter+$800
Food storage by person-months, quoted for your householdQuoted

Build it bigger

  • In a CUBE 20: about a year of food for 4 people

Where a fixture is also listed in your Plumbing or Waste system, it is charged once; your written quote confirms it. Package prices are preliminary, November 2026, and confirmed in writing after the site visit.