Room package · RX-1

Decontamination

Between the entry and the living space: drop contaminated clothing, walk through the shower, dress on the clean side. Decon water is kept apart from gray water.

Decon
Decontamination in one cube, roof off.
Room package, per cube$13,400Built into a CUBE or CUBE HD; the interior finish ($12,000) is priced with the cube
  • Contamination stops here. clothing goes in a sealed bin, people wash, and nothing reaches the bunks
  • Decon water kept apart. a sealed tank, not the gray-water system, so contamination is never pumped through the house
  • Wipe-down room. stainless and coved surfaces that clean in minutes
FlowDirty side (entry) to clean side (living)
ShowerStainless 40 x 48 in walk-through, thermostatic
Decon waterSealed 50 gal tank, separate from gray water, pump-out
AirNegative pressure, exhausted through the filtered side
SurfacesStainless to 48 in, wipe-down everywhere
Added weightAbout 590 lb, shipped inside the cube

Floor plan

Laid out to fit
a 9 ft room.

FROM ENTRY (dirty side)PORTAL 42 in to next cube (mate collar)Drop binWalk-through showerClean benchCabinet

About 8 ft 10 in square inside the finished walls. Entry from the next cube at the bottom; the yellow bar is the second portal, capped for a future cube.

What is included

  • Walk-through shower: Stainless 40 x 48 in stall with an opening on each side and curtains
  • Shower valve and head: Thermostatic valve, handheld sprayer and fixed head
  • Clothing drop: Sealed steel bin with gasketed lid and liners
  • Clean clothes cabinet: Bolted cabinet on the clean side
  • Decon drain and holding tank: Large floor drain to a sealed 50 gal tank with a pump-out, kept apart from gray water
  • Supply piping: PEX branch with shutoffs
  • Leak protection: 2 leak sensors and a motorized shutoff
  • Clean-side bench and hooks: Welded bench and hooks on the clean side
  • Meter mount: Bracket for a radiation and dose-rate meter at the clean side
  • Stainless lower walls: Stainless panels to 48 in, FRP above, coved floor membrane
  • Exhaust to the filtered side: 100 cfm exhaust ducted to the air system exhaust, keeps the room negative

How it is built

Built in our shop, inside the cube: wet-area walls, plumbing, wiring, fixtures and cabinets, then pressure tested, flood tested and leak tested. On site, your installer snaps the water, drain, power and air jumpers together at the cube joint and runs every fixture.

Upgrades

Furnished add-on clothing and boot covers, decon soap, towels, waste bags and a survey meter+$1,800

Build it bigger

  • Place it right after the Entry and Airlock cube

Where a fixture is also listed in your Plumbing or Waste system, it is charged once; your written quote confirms it. Package prices are preliminary, November 2026, and confirmed in writing after the site visit.